Maryland Bids > Bid Detail

Command Post Integrated Infrastructure (CPI2) - Request for Information

Agency:
Level of Government: Federal
Category:
  • 58 - Communications, Detection and Coherent Radiation Equipment
Opps ID: NBD00159631513242048
Posted Date: Nov 30, 2023
Due Date: Dec 8, 2023
Source: https://sam.gov/opp/c579e525ad...
Follow
Command Post Integrated Infrastructure (CPI2) - Request for Information
Active
Contract Opportunity
Notice ID
CPI2_RFI
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
AMC
Sub Command
ACC
Sub Command 2
ACC-CTRS
Sub Command 3
ACC-APG
Office
W6QK ACC-APG
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Sources Sought (Updated)
  • All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Updated Published Date: Nov 30, 2023 09:30 am EST
  • Original Published Date: Nov 17, 2023 04:12 pm EST
  • Updated Response Date: Dec 08, 2023 03:00 pm EST
  • Original Response Date: Dec 01, 2023 03:00 pm EST
  • Inactive Policy: 15 days after response date
  • Updated Inactive Date: Dec 23, 2023
  • Original Inactive Date: Dec 16, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code:
  • NAICS Code:
  • Place of Performance:
    Aberdeen Proving Ground , MD
    USA
Description View Changes

**Please Note**



Q&A Responses Posted to Attachments on 30 November 2023



This posting has been updated to adjust the submission deadline to 8 December, 2023. There is no mandatory format, however, interested parties are encouraged to limit responses to 7 pages and utilize MS Word or PDF format.



As the Army continues to evolve its readiness and adaptability to meet an ever-changing fight, so must the Command Post (CP). The future CP program must serve the needs of the Division as the Unit of Action and the lighter, more mobile units at BDE and below. Commanders must have the ability to setup and configure their CPs to meet unique mission and terrain needs and constraints. The desire to tailor the Command Post configuration must naturally be balanced with the DOTMLPF-P, acquisition, and cost considerations. PEO C3T wants to understand the art of the possible and is looking to industry to inform the acquisition strategy going forward.



1. Given the above, how would you design a tailorable, affordable, trainable, and dispersed Command Post? The Army would like to provide commanders options with possibly multiple configurations based on mission type and operating environment. What configurations, technologies, and options would you propose?



a. How would you support this effort at the BCT/DIV echelon of the Army?



b. How would you approach a vehicle agnostic CP maximizing dispersion, survivability, and mobility? What integrated technologies would enable this type of modular CP approach?



c. What technologies and capabilities could be included in a transit case-based configuration? (CP equipment package that can be transferred to vehicle or building rapidly)



d. What network transport diversification options would you offer to maximize CP mobility and dispersion while still maintaining robust collaboration across the CP?



e. What accessories (tables, chairs, storage, etc.) would you include in each configuration that maintains the vehicle tailored/agnostic approach as much as possible?



f. What On the Move (OTM) capabilities and technologies could be possible to enable all CP operations (Communications, Power, Collaboration, etc.)?



2. What core competencies does your company offer that align to the above? E.g. Digital engineering processes, manufacturing, software, platform integration, hardware and infrastructure agility, etc.



3. What acquisition strategy and contract mechanism would best align to this modular CP approach? What deliverables and prototyping opportunities would benefit the Army? Please include suggested incentive structures, high level schedule, and user engagement strategy.



4. Are there other considerations in the development of a future Command Post that the government has not yet considered?


Attachments/Links
Contact Information
Contracting Office Address
  • HQ CECOM CONTRACTING CENTER 6565 SURVEILLANCE LOOP
  • ABERDEEN PROVING GROU , MD 21005-1846
  • USA
Primary Point of Contact
Secondary Point of Contact
History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >