Ballenger Creek Interconnect Pump Station

Agency: Frederick
Level of Government: State & Local
Category:
  • 43 - Pumps and Compressors
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD11575411388776366
Posted Date: Dec 1, 2022
Due Date: Dec 8, 2022
Solicitation No: IFB 23-1 Addendum 6
Source: https://cityoffrederick.ionwav...

Bid Opportunity Detail

Bid Information



Type
Invitation for Bid
Status
Issued
Number
IFB 23-1 Addendum 6 (Ballenger Creek Interconnect Pump Station)
Issue Date & Time
10/14/2022 11:28:11 AM (ET)
Close Date & Time
12/8/2022 02:00:00 PM (ET)
Time Left 6 days 20 hours 44 minutes 37 seconds
Notes
Construction of the Ballenger Creek Interconnect Pump Station.


All bids must be submitted via this system.



Contact Information
Name
Keisha Brown Purchasing Manager
Address
111 Airport Drive East
Frederick, MD 21701 USA
Phone
(301) 600-1194
Fax
Email
klbrown@cityoffrederickmd.gov




Bid Documents







Document name Format

Bid Invitation

Acrobat / PDF

Public Question & Answer

Acrobat / PDF


Bid Attachments
















File Name Description File Size

IFB 23-1 Ballenger Creek Pump Station Front End .pdf
Solicitation Document 448 KB

Balleneger Creek Interconnect PS - Specifications from WRA.pdf
Technical Specifications 5.85 MB

Ballenger Creek PS - Drawings Updated 07282022.pdf
Drawings 22.23 MB

Existing Secondary Disinfection Facility.pdf
Drawings of Existing 3.11 MB

Potomac Edison 3 Phase Design.pdf
PE Design 63 KB

MWBE Participation Form - Contract by Contract.pdf
Participation Form 211 KB

Ballenger Creek PS Attendance Sheet.pdf
Site Visit Sign-in Sheet 167 KB

Ballenger Creek PS Final Boring Report.pdf
Boring Report 3.41 MB

Ballanger Creek Interconect Pump St Structural Details - Response to Questions.pdf
Additional Structural Details 512 KB

09960 - High Performance Coatings.docx
High Performance Coatings 60 KB

Ballenger Creek IPS- Approved Site Plan.pdf
Site Plan 3.88 MB



Bid Questions
















Question
In the panel specification 07412, McElroy Metals is named, but the spec also says to use 032 aluminum. McElroy does not do aluminum only steel. Therefore, can we use another Manufacturer’s system such as Petersen Aluminum?
Answer Peterson Aluminum is an acceptable alternative manufacturer.
Submitted 11/17/2022 10:59:42 AM (ET)


Question
An answer to a previous question was not clarified in the boring report. Please confirm that if improvements to the building foundation subgrade are required such as undercutting that this will be a changed condition and be paid via change order. The boring report referred to a chance of undercutting being required.
Answer

The bid shall be based on the contract documents and subsurface information available, i.e. the boring logs. If it is determined that there is work that is outside of the contract, then a change order will be considered.

Submitted 11/16/2022 01:58:29 PM (ET)


Question

A significant portion / area of the existing asphalt drive will be removed in order to install the underground utilities on this project yet there is not a note nor a standard detail directing the contractor to replace the asphalt. When excavation for the new generator is included a significant portion of the site will be damaged. Is it possible to show the limits of asphalt restoration? Additionally, because so much of the area will be disturbed, would the City prefer to have the trenches repaired and then the drive area overlayed?


If overlaying is to be considered, will the remaining asphalt need to be milled?


Drawing C-5 Utility plan depicts “Asphalt” with only a small strip of asphalt shown in front of the new building entryway. Limiting new asphalt to only this small strip does not address the considerable amount of asphalt that will be demolished during this project. Can a drawing be provided that depicts the limits of asphalt removal and subsequent replacement?


Answer Use City’s Standard detail ST-2.0 for trench patching. Additionally, a complete 1.5" mill and overlay for the complete asphalt section will be required when construction has been completed.
Submitted 11/16/2022 09:33:49 AM (ET)


Question
Specification 07131 Self Adhering Sheet Waterproofing is included in the bid documents. Neither the specifications or drawings call out a location for installation of this waterproofing. Please provide location(s) waterproofing is to be installed.
Answer The Self Adhering Sheet Waterproofing material is not required.
Submitted 11/14/2022 09:23:54 AM (ET)


Question
We previously asked if a Geotech report was available, if a report is not available can you provide the information for the boring that is shown on C-3? This would help in determining what type of shoring or underpinning will be required for the existing building while we install the proposed 16” Effluent pipe
Answer Boring Report provided.
Submitted 11/9/2022 02:23:58 PM (ET)


Question
Since no Geotechnical report has been provided with subsurface recommendations, can you please confirm that if improvements to the building foundation subgrade are required such as undercutting or piles this will be a change order to the contract?
Answer Boring Report provided.
Submitted 11/9/2022 02:23:34 PM (ET)


Question
Reference detail 4/M-4 for the exhaust fan calls out note 3 and 4 but these notes are not provided in the detail. Please provide these notes.
Answer The specific keynote boxes are misnumbered. Note #1 "FRAME AND PLATE SHALL BE HOT DIP GALVANIZED AFTER FABRICATION." applies to the steel frame with the "3" keynote. Note #2, "ALL DAMPERS SHALL MATCH IN NOMINAL SIZE WITH THEIR RESPECTIVE LOUVERS UNLESS OTHERWISE INDICATED ON THE CONTRACT DRAWINGS. WHERE MULTIPLE FANS SHARE A LOUVER, THE BACKDRAFT DAMPERS SHALL BE PARTITIONED FOR EACH RESPECTIVE FAN. SEAL AS REQUIRED." applies to the backdraft damper with the "4" keynote.
Submitted 11/8/2022 04:03:09 PM (ET)


Question
Spec section 10213, Fixed Louvers shows 4” depth but the louver schedule on drawing A-7 shows 6” depth. Please clarify which depth is required.
Answer Louvers shall be 6" depth per louver schedule and louver detail 4/A-7.
Submitted 11/8/2022 04:02:50 PM (ET)


Question
Please clarify what insulation type and thickness is required for the split-system ductless piping.
Answer ISOCLIMA - 1/2"UV RESISTANT
Submitted 11/8/2022 04:02:27 PM (ET)


Question
Please confirm if a pre-charged line set is acceptable for the split system units.
Answer Pre-charged line set is not acceptable. Line set will need to be cut to exact dimensions, properly connected, evacuated, charged, and tested.
Submitted 11/8/2022 04:02:09 PM (ET)

Items 1 - 10 shown of 58 • Page 1 of 5 shown

First 1 2 3 4 5 ... > Last




Bid Event Participation Activity







Activity Date Activity Name Description
11/2/2022 10:00:00 AM (ET)
Pre-Bid Site Visit (Optional)

315 Ballenger Center Dr., Frederick, MD 21703


Plan Holders













Supplier Name City State Contact Name Email Phone


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50



6 items in 1 pages
American Contracting & Environmental Services, Inc. Columbia MD Jeff Carr jeff.carr@aceservinc.com (301) 490-9100
Bright Masonry Inc d/b/a Bright Construction Group Merrifield VA Dave Zupko dzupko@brightconstructiongroup.com (703) 533-7422
Callas Contractors, LLC Hagerstown MD Timothy R. Campbell tcampbell@callascontractors.com (301) 739-8400
Micro-Tech Designs Inc Hampstead MD wesley.martin@microtechdesigns.com (410) 239-2885
Monacacy Valley Electric littlestown PA william gretok bgretok@monacacy.com (717) 359-9500
W.M. Schlosser Company, Inc Hyattsville MD (301) 773-1300