Linganore Water Treatment Plant - Alternatives Analysis Study

Agency: Frederick
Level of Government: State & Local
Category:
  • 68 - Chemicals and Chemical Products
  • B - Special Studies and Analyses - Not R&D
Opps ID: NBD11575767785959611
Posted Date: Sep 25, 2023
Due Date: Oct 16, 2023
Solicitation No: RFP 24-B Addendum 2
Source: https://cityoffrederick.ionwav...

Bid Opportunity Detail

Bid Information



Type
Request for Proposal
Status
Issued
Number
RFP 24-B Addendum 2 (Linganore Water Treatment Plant - Alternatives Analysis Study)
Issue Date & Time
8/15/2023 01:52:15 PM (ET)
Close Date & Time
10/16/2023 03:00:00 PM (ET)
Time Left
20 days 21 hours 50 minutes
Notes
All submissions must be made online via this portal.

Contact Information
Name
Raven Garver Assistant Manager of Purchasing
Address
111 Airport Drive East
Frederick, MD 21701 USA
Phone
Fax
Email
rgarver@cityoffrederickmd.gov




Bid Documents








Document name Format


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



2 items in 1 pages

Bid Invitation

Acrobat / PDF

Public Question & Answer

Acrobat / PDF


Bid Attachments










File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



4 items in 1 pages

RFP 24-B Alternatives Analysis Study.pdf
Solicitation Document 277 KB

SBR and MWBE Participation Form - SBR Bids or RFPs 2023.pdf
SBR MWBE Status Form 268 KB

RFP 24-B Sign-In Sheet 08.24.23.pdf
Sign-In Sheet for Pre-Proposal Meeting 487 KB

Linganore Plant Location Map 2023.08.31.pdf
Linganore Plant Location Map 344 KB



Bid Questions
















Question
The due date is October 15, 2023 which is on a Sunday. Is that correct?
Answer The RFP due date has now been extended to Monday October 16th, 2023 at 3pm.
Submitted 9/15/2023 01:15:29 PM (ET)


Question
Do you add any treatment chemicals to the pond basins?
Answer No.
Submitted 8/31/2023 11:40:50 AM (ET)


Question
Is the pond treated with dam safety?
Answer No.
Submitted 8/31/2023 11:40:27 AM (ET)


Question
Is there a separate line from Lake Linganore to the pond basin?
Answer No.
Submitted 8/31/2023 11:40:05 AM (ET)


Question
Have the pond basins ever been dredged?
Answer Only the decant pond. In the past, it was dredged every four years (approximately 2.5 – 3 million was dredged). Now we have a yearly contract to dredge 1 millions gallons.
Submitted 8/31/2023 11:39:37 AM (ET)


Question
Does Frederick County also withdraw from Lake Linganore?
Answer According to Frederick County (Ken Orndorff, Superintendent Division of Water and Sewer Utilities Department of Water Purification and Distribution), they currently have a valid state water appropriation and use permit. They have not used that plant in over 10 years and if they needed too, it would require a major plant renovation. Their withdrawal permit is limited to a daily average of 300,000 and a max daily withdrawal of 2.0 mgd.
Submitted 8/31/2023 11:38:55 AM (ET)


Question
Are there any issues with the intake flow?
Answer No.
Submitted 8/31/2023 11:38:17 AM (ET)


Question
Are there additional funding sources for this project?
Answer This project is funded completely by the City of Frederick.
Submitted 8/31/2023 10:29:29 AM (ET)


Question
Would you have a map of where the DPW location and the Wastewater Treatment Plant are located?
Answer The map has now been uploaded as the attachment labeled "Linganore Plant Location Map 2023.08.31".
Submitted 8/31/2023 10:29:00 AM (ET)


Question
For the alternative site location, do you have any sites in mind?
Answer The City is looking for the proposers to give recommendations. Preferably, it would be around the area of the City’s Department of Public Works (DPW) building, located at 111 Airport Drive East Frederick, MD 21701. There is an adjacent area to the Linganore Water Plant that could be used for the “adjacent site location”.
Submitted 8/31/2023 10:25:23 AM (ET)

Items 1 - 10 shown of 15 • Page 1 of 1 shown

First 1 2 > Last




Bid Event Participation Activity








Activity Date Activity Name Description


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50



1 items in 1 pages
8/24/2023 10:00:00 AM (ET)
Pre-Proposal Site Visit Meeting

There will be a non-mandatory pre-proposal site visit meeting on Thursday August 24th, 2023, at 10:00am, located at the Linganore Water Treatment Plant 6436 Plant Rd Frederick MD 21701.


Plan Holders











Supplier Name City State Contact Name Email Phone


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50



4 items in 1 pages
Celadon Technologies, LLC Rockville MD Priyali Sen psen@celadontechnologies.com (301) 938-8775
Hazen and Sawyer Baltimore MD Jeremy Hise Jhise@hazenandsawyer.com (410) 539-7681
Herbert, Rowland & Grubic, Inc. Harrisburg PA (717) 564-1121
Whitman, Requardt and Associates, LLP Baltimore MD Carly Sniffen csniffen@wrallp.com (410) 235-3450

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >