The overall project is a failing septic system abatement project which will consist of two construction contracts:
Contract SAN 24-01- Septic Tank Effluent Pumps
Contract SAN 24-02- Community Pressure Sewer Mains
The work of this contract, Contract No. SAN 24-02, consists of the installation of approximately 21,000 linear feet of 2-inch and 3-inch HDPE pressure sewer mains. The work must utilize horizontal directional drill methods to the maximum extent possible. Work includes the placement of the mains, including the installation of division valves, clean-outs, air release valves, and curb stops to approximately 211 improved properties and approximately 55 vacant lots. Work will also include road restoration as required. A portion of the Work is in SHA rights of way